BUILDEA LEAN construction

|  zdroj: Lean Project delivery, D. Umstot, D. Fauchier

iba 30% času na stavbe sa skutočne stavia

40% sa strávi čakaním

30% času spotrebujú pohyby

až v 82% priestorov stavby nikto nepracuje 

naše LEAN nástroje:

  • Takt Time & Pull Planning

  • Shopfloor management

  • AI cost estimation, AI schedulling

  • Value Stream Mapping

  • Just in Time logistics

  • 5S, FMEA, ISHIKAWA, 5W1H,

  • Hoshin Kanri, Kaizen, ...

Construction Manager

čo je LEAN?

Systematický a vedecký prístup v odstraňovaní plytvaní.

Akých plytvaní?  

Vady  |  Nadprodukcia  |  Čakanie  |  Nevyužitý talent  |  Presuny  |  Zásoby  |  Pohyby  |  Nadmerné spracovanie

"Niet ničoho tak zbytočného, ako robiť efektívne to, čo robiť vôbec nebolo treba."

|  Peter F. Drucker

You can influence 85% of delay causes

only 15% of construction delays is due to weather

47% poor planning

25% lack of workers

7% lack of material

4% design errors

2% drying not as planned

Stop having a genius disease

Yes,

each of us strives to do things better every day.

But,

sometimes it is difficult to step back and see the waste that have been introduced into the processes after years of their execution. 

LEAN provides you a system to eliminate these wastes with less effort. It creates an environment where the collective experience of all employees and partners find better solutions faster.

LEAN tools

VSM Value stream mapping

The difference between 1% and 2% is not just 1%, it's 100%.

Activity ratio in production processes is between 5-20%. In administration 1-5%. 

VSM helps to identify why and solve it.

Pull Planning + Shopfloor management

- utilises collective experience of group

- necessity for recording and eliminating the causes of delays

- increase the independence of suppliers

Takt Time planning

Empire State Building (1931) | 102 floors finished in 410 days. That is 489m2/day.

Today's construction pace is 35m2/day. Why?

82% of work area is empty.

Let us teach you Takt Planning.

Kaizen

Set up the improvement collection system. Many raindrops make an ocean.

In Fuji Electric (Tokyo) plant, collected 127 improvement suggestions per employee per year, with 85% of them incorporated. Compared to the western companies of 0.2 suggestion per employee per year.

| source: Bringing Out the Best in People, Aubrey C. Daniels

Just in Time Logistics

Stop renting expensive public spaces that require security. We will help you set up a supply chain where materials are delivered to the construction site just when it should be built in.

Reduce the risk of damage or theft and get greater flexibility in changing plans. 

Let's free up space to work.

Our
Solutions

Construction Site

Trainings & simulations

We offer specialized trainings and simulations, designed to enhance your team's understanding and application of LEAN construction principles.

Our program equips participants with the tools and techniques needed to streamline processes, reduce waste, and improve efficiency on construction.

Mentoring & Coaching

Our tailored approach and experience with training construction professionals ensures the right guidance & support protecting your strategy from employee resistance

Our coaching uncover your talent.

IMG-757.jpg

Richard HURAI

making construction
a better place

15 years in construction industry.

LEAN manager | construction manager | cost estimator | procurement engineer | civil engineer

It’s all about a dialogue

A few words from our customers and partners.

Finding a capable partner who truly understands construction and LEAN principles was a challenge. Now, I can confidently transform our projects into more efficient and cost-effective operations.

foto-20_edited.jpg

Milan Murcko

CEO, YIT Slovakia a.s.

Thanks to his conviction and vibrant energy, Richard is able to spread enthusiasm to a broader group of people, actively engaging them in collaboration.

Veronika Gregorková_edited.jpg

Veronika Gregorková 

Cofounder, Lean Institute Sovakia

 

Richard is a master at creating value from waste. I admire his analytical approach to process design and his passion for construction.

Marek_Demcak.JPG

Marek Demčák

Head of Production, Vaillant Group